The Hardcore Crushing team recently completed a soft strip-out for a client on a large commercial property in Skipton — making way for 30 new residential apartments by stripping the building back to shell.
The client required the existing commercial building to be stripped back completely in preparation for a residential conversion. Soft strip works are a critical first phase of any conversion project — every item of fitted fabric, fixture, fitting, service, and internal partition needs to be carefully removed and disposed of before structural works can begin.
Our team carried out the full internal soft-strip, including:
On completion the building was handed back as a clear shell — ready for the structural conversion works to begin. All waste was removed and disposed of correctly, with recyclable materials diverted from landfill wherever possible.
A thorough, professional soft strip-out — the building handed back to shell, clean and clear, ready for its new life as 30 residential apartments.

Large Skipton commercial property stripped back to shell — all waste removed, recyclables diverted from landfill, site handed over clean and clear.

Demolition of a 3-deck multi-storey car park and internal strip-out of the former Tesco/O2 Call Centre building.
View Project
High-profile airport demolition — asbestos removal, soft strip, structural demolition and on-site crushing. 99% recycled.
View Project
Complex bridge removal and demolition at Hyde, Manchester with Eric Wright Civil Engineering.
View ProjectAvailable 24 hours a day, 7 days a week, 365 days a year across Lancashire and the North West.